Eastwood worked closely with the wider team to ensure solutions were found to the various design challenges posed by this Grade II listed site:
- Façade retention: The rear of the building was demolished, with the façade retained in place during the works using propping and a scaffold ballast. This was then tied to the new build steel frame and refurbished to a high standard.
- Foundation excavation: Carefully executed to prevent undermining nearby listed structures.
- Multi-level ground floor: Retaining walls were designed to support the weight of the steel frame, acting as foundations, reducing concrete use and improving sustainability.
- Eccentric column loads: Utilised strap foundation technique to optimise load distribution.
- Structural alterations: Meticulously planned to maintain historical integrity whilst minimising intrusive works.
- Drainage strategy: Designed to preserve the original cobblestone courtyard.