

Eastwood were appointed civil and structural engineers on this project undertaking an extensive range of engineering services both pre-planning and post-contract.
Pre-planning, Eastwood completed Geotechnical and Geo-environmental Site Investigation work, prepared the subsequent Site Remediation Plan, and developed the drainage strategy to the satisfaction of the Local Lead Flood Authority and Severn Trent Water.
Post-contract, Eastwood undertook foundation and superstructure designs, developed detailed drainage proposals, and completed remediation verification checks as required by the Local Authority.
Eastwood have worked with Ongo Homes, the largest housing provider in North Lincolnshire, on a number of social housing projects in recent years, having developed a great working relationship. One based on open lines of communication, trust and flexibility. A client we’re proud to work with.
“Ongo Homes reinvest all profit into improving neighbourhoods and creating opportunities for local people. They are dedicated to creating a better place for people to live which inspires everyone who works with them”, Andy Cross, Associate (Eastwood Consulting Engineers).
