The project introduced a new 26m
square helideck on top of an existing hospital building with a dedicated access
direct into the A&E department.
The project involved constructing a
new helideck on top of an existing five storey 1960s building, an extension to
an existing lift tower with a control room and a link bridge between the two
structures.


Appointed as Civil and Structural Engineers from RIBA stages 2 to 5.
Engineering services:
Over 10 years in the making; the project required innovative engineering designs to help make it a reality:

